ICS Caregiving Wing Construction photos. Check back here frequently for updated photos. Click on each image to see a larger view.
Caregiving Services 5-19-08Kitchen 5-19-08Development Office2 5-19-08 New trees 042308Laying carpet 042308Carpet 042308 Moving soon 04-17-08Site work 040408Almost ready for paint 040408 Insulation south wall 022108Insulation & stucco wire 022108Back door exit 022008 Not for the faint-hearted 021908Scaffolding 021908Garden area looking west 021408 Tarring the roof 021408Partitioning the rooms 021208Inside view 020808 South wall 020808Closing it in 020608More outside wall 020608 Nailing up plywood 020608Raising north wall 020508Raising west wall 020508 Wall going up 02/04/08Working on a rainy day 02/04/08Framing 01/31/08 Outside Walls 01/31/08Smoothing it out. 01/29/08And the concrete started flowing. 01/29/08 Preparing for laying concrete 01/24/08Bringing in fill dirt. 01/24/08That is a deep ditch! 01/23/08 Laying a new sewer pipe 01/23/08Getting ready to pour concrete 01/22/08Working hard 01/22/08 The work site 01/22/08Clearing away the dirt 01/18/08Trench waiting to be filled in 01/18/08 Still digging 01/16/08Digging trenches for plumbing 01/16/08Flattening the bottom of the trenches 01/10/08 View from Ina 01/10/08The long view 01/09/08Taking measurements 01/09/08 Moving Earth 01/09/08Digging trenches 01/10/08