ICS Caregiving Wing Construction photos. Check back here frequently for updated photos. Click on each image to see a larger view.




Caregiving Services 5-19-08

Kitchen 5-19-08

Development Office2 5-19-08
 

New trees 042308

Laying carpet 042308

Carpet 042308
 

Moving soon 04-17-08

Site work 040408

Almost ready for paint 040408
 

Insulation south wall 022108

Insulation & stucco wire 022108

Back door exit 022008
 

Not for the faint-hearted 021908

Scaffolding 021908

Garden area looking west 021408
 

Tarring the roof 021408

Partitioning the rooms 021208

Inside view 020808
 

South wall 020808

Closing it in 020608

More outside wall 020608
 

Nailing up plywood 020608

Raising north wall 020508

Raising west wall 020508
 

Wall going up 02/04/08

Working on a rainy day 02/04/08

Framing 01/31/08
 

Outside Walls 01/31/08

Smoothing it out. 01/29/08

And the concrete started flowing. 01/29/08
 

Preparing for laying concrete 01/24/08

Bringing in fill dirt. 01/24/08

That is a deep ditch! 01/23/08
 

Laying a new sewer pipe 01/23/08

Getting ready to pour concrete 01/22/08

Working hard 01/22/08
 

The work site 01/22/08

Clearing away the dirt 01/18/08

Trench waiting to be filled in 01/18/08
 

Still digging 01/16/08

Digging trenches for plumbing 01/16/08

Flattening the bottom of the trenches 01/10/08
 

View from Ina 01/10/08

The long view 01/09/08

Taking measurements 01/09/08
 

Moving Earth 01/09/08

Digging trenches 01/10/08